02 / SYSTEMS & EQUIPMENTBUILT AROUND THE DUTY

Every transfer
has a purpose.

Different materials and operating conditions call for different ways to move, store and control flow. Describe the duty and see which families fit.

CONVEY → STORE → CONTROL

SYSTEM FAMILIES

The right configuration
depends on context.

These equipment families are a starting point for application discussions. The final configuration, scope and supply responsibilities are defined against the design basis of each project.

FLOW FINDER

Describe the duty.
See where to start.

Tell us what is moving and what needs to happen to it. The equipment families re-order by fit, and the shortlist can go straight into a project enquiry. Guidance is indicative: every selection is confirmed against the design basis.

ENGINEERING SUPPORT

Every project draws on these. Pick a project stage to see where to begin.

01 / SERVICE

Studies & feasibility

Establish the design basis: material, duty, site and the questions still to resolve.

Often starts at: Early exploration · Existing plant modification
02 / SERVICE

Design & engineering

Layouts, 2D drafting, 3D modelling and structural analysis the project team can review.

Often starts at: Design in progress · Early exploration
03 / SERVICE

Equipment & integration

Define the package and its plant interfaces, then agree supply and site support.

Often starts at: Equipment specification · Existing plant modification

EQUIPMENT FAMILIES

Showing all 10. Choose a duty above to rank them by fit.

APPLICATION FIRST

Selection follows
the material.

01What moves

Properties of the bulk solid and any dust, wear or containment concerns.

02How it moves

Capacity, direction, transfer points and operating pattern.

03Where it works

Plant layout, access, existing interfaces and maintenance needs.

SPECIFYING A SYSTEM?

Start with
the application.

Tell us about the material, duty and site, even if the specification is still taking shape.