Cement · Hot Clinker · 450 t/h
Cement & Minerals
Clinker Overland Conveyor & Dome Reclaim System
High-temperature clinker transport from kiln cooler to dome storage, featuring custom rock-box impact transfer chutes and heavy-duty dust containment skirting.
The Challenge
Clinker arrives from the cooler at over 120°C with severe abrasive quartz and nodule characteristics. Drop heights created airborne dust clouds and rapid puncture wear on conventional rubber belts. Deep dome dead zones caused clinker hydration and agglomeration during humid periods.
The Engineering Solution
Engineered a heat-resistant EP belt conveyor (T200 grade) with stepped rock-box impact chutes to decelerate material gently. Designed multi-point hopper reclaim beneath the dome with manganese liner plates and double-seal polyurethane skirtings.
Key Technical Parameters
- Throughput
- 450 t/h
- Belt width
- 1,000 mm
- Operating temp
- Up to 140°C peak
- Dust containment
- Enclosed rock-box chutes
Scope Delivered by Greening
- Feasibility study & trajectory analysis
- 3D laser scanning & interface checking
- GA & fabrication drawings for transfer towers
- Belt, idlers, chute & skirting package supply
- Assembly supervision during scheduled kiln shutdown